Adaptive AgroTechROBOTICS & SYSTEMS CONSULTANCY
HARVEST RELAY / ORCHARD LOGISTICS

Harvest capacity is a system.

Coordinate picking, transport and unloading. Find the constraint before investing in the next machine.

ENGINEERING SIMULATION30-minute study · identical crop stock
Orchard operationReady
00:00 / 30:00
HARVESTING PLATFORMH1 / Dual-arm fruit handlingDrag to orbit · scroll to zoom · click an asset
OPERATION LOCATOR6 ROWS
Green · harvesting   Blue · transport
Shared crossing · available
Preparing the 3D operationOrchard, articulated machinery and packing infrastructure
Delivered to depot0 kgOnly completed unloads count
Harvester service wait0 %Waiting for bin collection
Delivered throughput0 kg/hElapsed-time average
Depot queue0 minSum of carrier waiting time
MATERIAL ACCOUNTING
On trees—
→
Harvester bins—
→
In transport—
→
At depot—
Balanced
LATEST EVENT
01 / CONFIGURE THE OPERATION

Use the conditions of your farm.

Crop, vehicle and cost assumptions

Hourly rates are editable scenario inputs, not supplier quotations. Include energy, depreciation, maintenance and labor in your own rates. The model does not calculate purchase-price payback.

6 crop rows · 5 m spacing · one unloading bay · identical seeded crop distribution

02 / COMPARE BEFORE YOU COMMIT

What actually improves delivery?

Two dispatch policies. Six transport fleet sizes. The same crop, layout and 30-minute evaluation window.

01 — 06
A controlled comparison, ready to run.

Measure the marginal benefit of another carrier and see whether transport, traffic or unloading becomes the next constraint.

Planning model · synthetic crop stock · calibrate picking rates, handling times and travel paths before making an investment decision.

03 / ENGINEERING BASISA useful model makes its boundaries visible.+

Conserved material flow

Initial crop = fruit remaining + harvester bins + carrier bins + delivered fruit. A bin still in transit at the end of the shift is not counted as delivered. Row yield varies by ±20% using a fixed seed.

Dispatch and shared resources

Fixed assignment reserves carriers for static picker groups. Coordinated dispatch prioritizes predicted service delay. Exclusive row service and one combined headland/yard access corridor are reserved. Only one vehicle uses that corridor at a time. This conservative planning rule limits throughput. One unloading bay operates first-in, first-out.

What the model does not claim

Picking rate is an input, not a prediction of vision or manipulation performance. Fruit and arm animations illustrate activity. Battery use, slip, damage, sensor errors, detailed turning dynamics and safety certification are outside scope.

For research and consultancy

Use the paired comparison to test dispatch hypotheses, then repeat with your measured rates and site geometry. A smooth animation is not validation. Export the inputs and mass balance with every result.