Lecture video
Video unavailable here? Watch on YouTube. Captions and playback speed are available in the player.
Study Collision Avoidance 08 | RRT*: Sampling and Rewiring a Collision-Free Route. Use the accompanying model, numerical example and practical task to connect the topic to a measurable engineering result. Notes are original supplemental material, not a transcript.
Learning Objectives
- Explain the role of sampling-based planning and rewiring in the engineering system.
- Calculate the worked quantity with consistent units.
- Design a measurement that can reveal an implementation failure.
Study guide
Original companion notes. These notes support the topic of this lesson. They are not a transcript or a claim about the exact contents, hardware settings or examples in the video.
Lesson focus: Collision Avoidance 08 | RRT*: Sampling and Rewiring a Collision-Free Route
Define the input, measured output, units and pass/fail condition before running the experiment.
Sampling-based planning and rewiring
A rapidly exploring random tree grows through collision-checked extensions toward sampled configurations. RRT* adds local parent selection and rewiring to improve path cost with further samples. A finite run does not certify a globally optimal path.
Model, units and assumptions
q is a configuration and the displayed cost uses Euclidean length; appropriate configuration metrics and steering constraints are required for a real vehicle. Check the complete connecting motion, not only the endpoints.
Worked engineering example
Candidate parents have costs 4 and 5 m, with connecting lengths 2 and 0.5 m. Their candidate costs are 6 and 5.5 m, so the second is preferable if both connections are feasible.
Practical task and evidence
Apply the following procedure to the topic of this lesson: Collision Avoidance 08 | RRT*: Sampling and Rewiring a Collision-Free Route.
- Fix the random seed when debugging, then evaluate multiple seeds for performance.
- Visualize rejected connections and state the collision-check resolution.
- Compare success rate, planning time and path cost at equal computation budgets.
Submit: a diagram or interface table, a short timestamped dataset, the calculation with units, and a paragraph explaining the largest observed limitation.
Check your understanding
Question. Parent cost is 3.2 m and extension cost is 0.7 m. What is the new path cost?
Show worked answer
3.9 m under an additive length objective.
Extension. Change one assumption in the model and explain which measurement would reveal that it no longer holds.
Summary
Suggested Reading & Resources
- ReadingROS 2 concepts and tutorialsOpen ↗
Primary documentation or original technical reference; check the version used in your lab.