ESP32 Solar Battery Control | Essential & Auxiliary Load Priority
An ESP32 can shed auxiliary loads as solar battery reserves fall, leaving more energy for essential equipment.
The key idea
Priority matters when several devices draw from one battery. A separate recovery condition keeps an auxiliary load from reconnecting immediately after switching it off causes battery voltage to rebound.
What to remember
- Define which loads are essential before energy becomes scarce.
- Give reconnection a distinct condition from disconnection.
Check your understanding
Why can an auxiliary load chatter on and off at a single voltage threshold?
Show the explanation
Its removal raises the measured voltage and its reconnection can pull the voltage down again.