Two-Tank Water Transfer | Demand, Full-Level Stop & Source Protection
A transfer pump needs demand at the receiving tank, room for more liquid, and enough liquid in the source tank. These conditions address different reasons to start or stop.
The key idea
The destination can still ask for water after the source reaches its low-level limit. Giving the source protection and destination full-level stop priority prevents the demand signal from sustaining a harmful transfer.
What to remember
- Destination demand requests a transfer.
- Source and destination limits determine whether transfer may continue.
Check your understanding
What should happen if the destination requests water while the source is too low?
Show the explanation
The pump should remain stopped until the source condition permits transfer.